US 82 over STREAM

Map

Coordinates:
+32.52135, -86.61560
32°31'17" N, 86°36'56" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts

Name:US 82 over STREAM
Structure number:001910
Old structure number:000000060100810 (from 1992 edition)
Location:8.1 MI.E.OF CHILTONCO LIN
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other (Rural) [02]
Length of largest span:9.8 ft. [3.0 m]
Total length:46.9 ft. [14.3 m]
Skew angle:45°
Owner:State Highway Agency [01]
Year built:1939
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: December 2015

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:2,950 [as of 2013]
Truck traffic:26% of total traffic
Structural appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Culvert condition:Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Operating rating:79.3 tons [72.1 metric tons]
Inventory rating:47.6 tons [43.3 metric tons]
Sufficiency rating:96.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$681,000

Previous Inspections

DateSuff. RatingConditionCulvert ConditionSD/FOADT
December 201596.3Fair6 out of 10-2950
December 201395.3Fair6 out of 10-2950
December 201195.3Fair6 out of 10-3050
December 200995.1Fair6 out of 10-3260
November 200760.3Fair6 out of 10-3300
November 200561.3Fair6 out of 10-3200
October 200361.3Fair6 out of 10-3120
November 200160.3Fair6 out of 10-3120
December 199958.5Good7 out of 10-2910
January 199860.5Good7 out of 10-3020
January 199658.4Good7 out of 10-2940
January 199458.4Good7 out of 10-2790
December 199161.4Good7 out of 10-2780