Share:

BUDDY DURHAM RD over BEAR CREEK

Map

Coordinates:
+34.73444, -88.08894
34°44'04" N, 88°05'20" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:BUDDY DURHAM RD over BEAR CREEK
Structure number:002248
Location:BUDDY FERRELL BRIDGE
Purpose:Carries highway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:122.1 ft. [37.2 m]
Total length:273.0 ft. [83.2 m]
Roadway width between curbs:18.7 ft. [5.7 m]
Deck width edge-to-edge:21.7 ft. [6.6 m]
Vertical clearance above deck:14.8 ft. [4.5 m]
Owner:County Highway Agency [02]
Year built:1948
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 13.5 / H 15 [2]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: May 2018

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:360 [as of 2000]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Basically intolerable requiring high priority of corrrective action [3]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:98.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,476,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
May 2018PoorFairPoorFair36098.0
May 2016FairFairFairFair36024.0
April 2014FairFairFairFair36023.8
June 2013FairFairFairFair36023.8
June 2012FairFairFairFair36023.8
March 2012PoorFairFairSerious3609.8
January 2011PoorFairFairSerious3609.8
March 2010PoorFairFairSerious3609.8
March 2008PoorFairFairSerious3609.8
July 2006PoorFairFairSerious3609.8
October 2004PoorFairFairSerious3609.8
November 2003PoorFairFairSerious36015.4
October 2002PoorFairFairSerious36015.4
February 2001PoorFairFairSerious36015.4
February 2000PoorFairFairSerious36015.4
January 1999PoorFairFairSerious36015.4
February 1997PoorFairFairSerious36015.4
February 1995FairSatisfactorySatisfactoryFair36046.1
November 1992PoorGoodPoorSatisfactory36033.8