Share:

PLEASANT GROVE RD over B"HAM SOUTHERN RAILROAD

Map

Coordinates:
+33.47108, -86.96244
33°28'16" N, 86°57'45" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts

Name:PLEASANT GROVE RD over B"HAM SOUTHERN RAILROAD
Structure number:003891
Location:PLEASANT GROVE RD * RR
Purpose:Carries highway over railroad
Route classification:Local (Rural) [09]
Length of largest span:41.0 ft. [12.5 m]
Total length:122.1 ft. [37.2 m]
Roadway width between curbs:24.9 ft. [7.6 m]
Deck width edge-to-edge:34.1 ft. [10.4 m]
Vertical clearance below bridge:20.0 ft. [6.1 m]
Skew angle:30°
Owner:City or Municipal Highway Agency [04]
Year built:1950
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: December 2016

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:1,500 [as of 2016]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Underclearances appraisal:Meets minimum tolerable limits to be left in place as is [4]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Scour condition:Bridge not over waterway. [N]
Operating rating:64.2 tons [58.4 metric tons]
Inventory rating:43.6 tons [39.6 metric tons]
Sufficiency rating:66.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,191,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
December 201666.6FairFairFairFair-1500
December 201477.7FairFairSatisfactorySatisfactory-1500
December 201277.7FairFairSatisfactorySatisfactory-1500
December 201072.6FairFairSatisfactorySatisfactory-1500
January 200972.6FairFairSatisfactorySatisfactory-1500
November 200672.6FairFairSatisfactorySatisfactory-1500
December 200472.6FairFairSatisfactorySatisfactory-1500
January 200372.6FairFairSatisfactorySatisfactory-1500
December 200072.6FairFairSatisfactorySatisfactory-1500
December 199872.8FairFairSatisfactorySatisfactory-1000
October 199672.6FairFairSatisfactorySatisfactory-1000
October 199444.2FairFairSatisfactorySatisfactorySD1000
October 199244.2FairFairSatisfactorySatisfactorySD1000