US 82 WBL over SCL RR
Map
Coordinates:
+32.32646, -86.3188332°19'35" N, 86°19'08" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | US 82 WBL over SCL RR |
Structure number: | 005126 |
Old structure number: | 00000006510091A (from 1992 edition) |
Location: | 1.1 MI E OF I65 |
Purpose: | Carries highway and pedestrian walkway over railroad |
Route classification: | Principal Arterial - Other (Rural) [02] |
Length of largest span: | 40.0 ft. [12.2 m] |
Total length: | 144.0 ft. [43.9 m] |
Roadway width between curbs: | 24.6 ft. [7.5 m] |
Deck width edge-to-edge: | 33.5 ft. [10.2 m] |
Vertical clearance below bridge: | 23.0 ft. [7.0 m] |
Skew angle: | 45° |
Owner: | State Highway Agency [01] |
Year built: | 1955 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | MS 18 / HS 20 [5] |
Number of main spans: | 5 |
Main spans material: | Concrete [1] |
Main spans design: | Tee beam [04] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
Latest Available Inspection: December 2017
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 17,650 [as of 2013] |
Truck traffic: | 8% of total traffic |
Deck condition: | Fair [5 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Underclearances appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Roadway alignment appraisal: | Better than present minimum criteria [7] |
Scour condition: | Bridge not over waterway. [N] |
Sufficiency rating: | 51.3 |
Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
Estimated cost of work: | $1,338,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
December 2017 | Fair | Fair | Fair | Satisfactory | 17650 | 51.3 |
December 2015 | Fair | Fair | Fair | Satisfactory | 17650 | 51.3 |
November 2013 | Fair | Fair | Fair | Satisfactory | 17650 | 64.3 |
November 2011 | Fair | Fair | Fair | Satisfactory | 16475 | 64.5 |
October 2009 | Fair | Fair | Satisfactory | Satisfactory | 19425 | 75.5 |
October 2007 | Fair | Fair | Satisfactory | Satisfactory | 19120 | 73.6 |
November 2005 | Fair | Fair | Satisfactory | Satisfactory | 18945 | 75.6 |
November 2003 | Fair | Satisfactory | Satisfactory | Satisfactory | 19495 | 76.6 |
December 2001 | Fair | Satisfactory | Satisfactory | Satisfactory | 19495 | 76.6 |
December 1999 | Fair | Satisfactory | Satisfactory | Good | 19930 | 74.5 |
January 1998 | Fair | Satisfactory | Satisfactory | Good | 19265 | 74.6 |
January 1996 | Fair | Satisfactory | Satisfactory | Good | 19255 | 75.1 |
January 1994 | Fair | Good | Satisfactory | Good | 18665 | 74.1 |
December 1991 | Fair | Good | Satisfactory | Good | 17470 | 74.3 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Reinforced Concrete Girder/Beam | linear ft. | 720 | 0 | 707 | 4 | 9 |
Deck |
Reinforced Concrete Top Flange | sq. ft. | 4,824 | 0 | 2,125 | 2,618 | 81 |
Substructure |
Reinforced Concrete Pier Wall | linear ft. | 79 | 71 | 8 | 0 | 0 |
Reinforced Concrete Abutment | linear ft. | 94 | 81 | 13 | 0 | 0 |
Steel Pile | each | 20 | 0 | 19 | 1 | 0 |
Steel Protective Coating | sq. ft. | 592 | 0 | 592 | 0 | 0 |
Reinforced Concrete Pier Cap | linear ft. | 138 | 125 | 8 | 1 | 4 |
Joints |
Open Joint | linear ft. | 188 | 133 | 7 | 48 | 0 |
Bridge Rail |
Steel or Aluminum Bridge Rail | linear ft. | 288 | 198 | 0 | 90 | 0 |
Reinforced Concrete Bridge Rail | linear ft. | 288 | 246 | 42 | 0 | 0 |