+34.77844, -86.60458
34°46'42" N, 86°36'16" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.


Structure number:006405
Old structure number:0000019045M0210 (from 1992 edition)
Purpose:Carries highway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:11.2 ft. [3.4 m]
Total length:24.0 ft. [7.3 m]
Roadway width between curbs:29.5 ft. [9.0 m]
Deck width edge-to-edge:31.2 ft. [9.5 m]
Skew angle:20°
Owner:City or Municipal Highway Agency [04]
Year built:1958
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: October 2016 

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:4,000 [as of 2015]
Truck traffic:1% of total traffic
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:47.1 tons [42.8 metric tons]
Inventory rating:28.3 tons [25.7 metric tons]
Sufficiency rating:74.8
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$525,000

Previous Inspections 

DateSuff. RatingConditionCulvert ConditionSD/FOADT
October 201674.8Good7 out of 10FO4000
October 201474.8Good7 out of 10FO4000
October 201274.8Good7 out of 10FO4300
October 201074.8Good7 out of 10FO4300
October 200859.0Good7 out of 10FO2800
November 200659.0Good7 out of 10FO2800
November 200459.0Good7 out of 10FO2800
November 200259.0Good7 out of 10FO2800
January 200161.0Good7 out of 10-2800
December 199861.2Good7 out of 10-2800
November 199658.1Good7 out of 10-2775
December 199458.2Good7 out of 10-2725
February 199368.5Good7 out of 10-2700
February 199175.6Good7 out of 10-2600