Share:

DICKINSON DRIVE over THREE MILE BRANCH

Map 

Coordinates:
+32.41098, -86.25492
32°24'40" N, 86°15'18" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:DICKINSON DRIVE over THREE MILE BRANCH
Structure number:007342
Location:200FT S.OF GUNTER AFB
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:14.1 ft. [4.3 m]
Total length:76.1 ft. [23.2 m]
Owner:City or Municipal Highway Agency [04]
Year built:1961
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:5
Main spans material:Concrete continuous [2]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: September 2016 

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:28,150 [as of 1988]
Truck traffic:4% of total traffic
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:Navigation protection not required [1]
Culvert condition:Moderate to major deterioration or disintegration, extensive cracking and leaching or spalls on concrete or masonry walls and slabs. Minor settlement or misalignment. Noticeable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection in one section, significant corrosion or deep pitting. [5]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:42.9 tons [39.0 metric tons]
Inventory rating:25.7 tons [23.4 metric tons]
Sufficiency rating:47.2
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$2,123,000

Previous Inspections 

DateSuff. RatingConditionCulvert ConditionSD/FOADT
September 201647.2Fair5 out of 10-28150
September 201447.2Fair5 out of 10-28150
September 201256.0Fair5 out of 10-28150
September 201067.0Fair6 out of 10-28150
September 200867.0Fair6 out of 10-28150
September 200667.0Fair6 out of 10-28150
September 200467.0Fair6 out of 10-28150
August 200267.0Fair6 out of 10-28150
October 200067.0Good7 out of 10-28150
November 199867.0Good7 out of 10-28150
August 199667.0Good7 out of 10-28150
April 199467.0Good7 out of 10-28150
May 199267.0Good7 out of 10-28150