This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.


+34.72881, -86.58767
34°43'44" N, 86°35'16" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.


Structure number:008105
Old structure number:0000014945M0010 (from 1992 edition)
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:13.1 ft. [4.0 m]
Total length:26.9 ft. [8.2 m]
Roadway width between curbs:65.0 ft. [19.8 m]
Deck width edge-to-edge:82.4 ft. [25.1 m]
Skew angle:30°
Owner:City or Municipal Highway Agency [04]
Year built:1930
Year reconstructed:1964
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 9 / H 10 [1]
Number of main spans:2
Main spans material:Masonry [8]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: January 2015 

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:9,000 [as of 2013]
Truck traffic:1% of total traffic
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Better than present minimum criteria [7]
Water adequacy appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Culvert condition:Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:95.2
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$715,000

Previous Inspections 

DateSuff. RatingConditionCulvert ConditionSD/FOADT
January 201595.2Fair6 out of 10-9000
January 201358.1Fair6 out of 10FO9000
January 201156.7Fair6 out of 10FO17300
January 200956.7Fair6 out of 10FO17300
January 200756.7Good7 out of 10FO17300
January 200556.7Good7 out of 10FO17300
January 200356.7Good7 out of 10FO17300
January 200156.7Good7 out of 10FO17300
February 199956.7Good7 out of 10SD17300
February 199756.4Good7 out of 10SD17200
March 199557.0Good7 out of 10SD17100
March 199357.0Good7 out of 10SD17000
March 199155.8Good7 out of 10SD16900