Share:

CO RD 82 over BOLIGEE CREEK

Map

Coordinates:
+32.73256, -88.06623
32°43'57" N, 88°03'58" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:CO RD 82 over BOLIGEE CREEK
Structure number:008649
Old structure number:0000000132029Z0 (from 1992 edition)
Location:0.5 MI N US 11 AT FOWLER
Purpose:Carries highway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:19.0 ft. [5.8 m]
Total length:151.9 ft. [46.3 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:25.9 ft. [7.9 m]
Owner:County Highway Agency [02]
Year built:1965
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:8
Main spans material:Concrete [1]
Main spans design:Channel beam [22]
Deck type:Concrete Precast Panels [2]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: July 2018

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:156 [as of 1995]
Truck traffic:15% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Poor [4 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Basically intolerable requiring high priority of corrrective action [3]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:31.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,063,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
July 2018PoorSatisfactorySatisfactoryPoor15631.0
May 2016PoorSatisfactorySatisfactoryPoor15631.0
March 2016PoorSatisfactorySatisfactoryPoor15631.0
March 2014PoorSatisfactorySatisfactoryPoor15631.0
March 2013PoorSatisfactorySatisfactoryPoor15631.0
March 2012PoorSatisfactorySatisfactoryPoor15631.0
March 2010PoorSatisfactorySatisfactoryPoor15631.0
March 2008PoorSatisfactorySatisfactoryPoor15635.1
March 2006PoorSatisfactorySatisfactoryPoor15635.1
January 2003PoorSatisfactorySatisfactoryPoor15635.1
October 2000PoorSatisfactorySatisfactoryPoor15635.1
February 1999PoorSatisfactorySatisfactoryPoor15635.1
January 1997PoorSatisfactorySatisfactoryPoor15635.1
February 1995PoorSatisfactorySatisfactoryPoor15627.9
February 1993PoorSatisfactorySatisfactoryPoor15027.9
February 1991PoorSatisfactoryGoodPoor15047.8