Facts

Name:GREEN COVE RD over ALDRIDGE CREEK
Structure number:009610
Old structure number:0000000645M0190 (from 1992 edition)
Location:GRN COVE RD * ALDRIDGE CR
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:32.2 ft. [9.8 m]
Total length:128.0 ft. [39.0 m]
Roadway width between curbs:48.6 ft. [14.8 m]
Deck width edge-to-edge:50.2 ft. [15.3 m]
Skew angle:30°
Owner:City or Municipal Highway Agency [04]
Year built:1968
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Not applicable [N]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: June 2016

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:7,000 [as of 2015]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Superior to present desirable criteria [9]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Operating rating:36.0 tons [32.7 metric tons]
Inventory rating:26.0 tons [23.6 metric tons]
Sufficiency rating:88.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,828,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
June 201688.3GoodGoodGoodGood-7000
June 201488.3GoodGoodGoodGood-7000
June 201276.2GoodGoodGoodGood-6100
June 201076.2GoodGoodGoodGood-6300
June 200876.2GoodGoodGoodGood-6300
October 200676.2GoodGoodGoodGood-6300
October 200476.2GoodGoodGoodGood-6300
October 200276.2GoodGoodGoodGood-6300
January 200176.2GoodGoodGoodGood-6300
February 199977.7GoodGoodGoodGood-2075
August 199677.5GoodGoodGoodGood-2050
April 199577.5GoodGoodGoodGood-2000
March 199577.5GoodGoodGoodGood-2000
June 199375.6FairSatisfactoryGoodSatisfactory-1900
February 199181.8FairSatisfactoryGoodSatisfactory-1800