Share:

I-20 over TOMBIGBEE RIVER RELIEF

Map

Coordinates:
+32.75748, -88.07449
32°45'27" N, 88°04'28" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:I-20 over TOMBIGBEE RIVER RELIEF
Structure number:010480
Old structure number:00000I59320020B (from 1992 edition)
Location:3.5 MI S OF BOLIGEE
Purpose:Carries highway over relief for waterway
Route classification:Principal Arterial - Interstate (Rural) [01]
Length of largest span:41.0 ft. [12.5 m]
Total length:164.1 ft. [50.0 m]
Roadway width between curbs:39.4 ft. [12.0 m]
Deck width edge-to-edge:43.0 ft. [13.1 m]
Owner:State Highway Agency [01]
Year built:1971
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Prestressed concrete continuous [6]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

Latest Available Inspection: September 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:11,035 [as of 2013]
Truck traffic:44% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:95.0
Estimated cost of work:$1,951,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
September 2018FairFairSatisfactorySatisfactory1103595.0
April 2017FairFairGoodFair1103583.8
April 2015FairFairGoodFair1103583.8
April 2013FairSatisfactoryGoodGood1103596.0
April 2011FairSatisfactoryGoodGood961096.1
April 2009FairSatisfactoryGoodGood993596.1
April 2007FairSatisfactoryGoodGood1032597.0
April 2005FairSatisfactoryGoodGood921597.1
April 2003FairSatisfactoryGoodGood957597.1
April 2001FairSatisfactoryGoodGood957597.1
April 1999FairSatisfactoryGoodGood859097.2
April 1997FairSatisfactoryGoodGood771097.3
April 1995FairSatisfactoryGoodGood663597.5
June 1993GoodGoodGoodGood626597.5
July 1991GoodGoodGoodGood616592.5

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Prestressed Concrete Girder/Beamlinear ft.959959000
Deck
Reinforced Concrete Decksq. ft.7,05204,7212,3310
Substructure
Reinforced Concrete Abutmentlinear ft.106106000
Steel Pileeach1818000
Reinforced Concrete Pier Caplinear ft.116114020
Joints
Compression Jointlinear ft.8600860
Bearings
Elastomeric Bearingeach3603600
Movable Bearingeach128040
Steel Protective Coatingsq. ft.65010
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.328032800