Share:

FAP 94 (DAY ST) over OAK ST

Map

Coordinates:
+32.36500, -86.32333
32°21'54" N, 86°19'24" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:FAP 94 (DAY ST) over OAK ST
Structure number:010874
Location:I65 AND I85 INTERCHANGE
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:75.1 ft. [22.9 m]
Total length:212.0 ft. [64.6 m]
Roadway width between curbs:38.1 ft. [11.6 m]
Deck width edge-to-edge:43.6 ft. [13.3 m]
Vertical clearance below bridge:23.0 ft. [7.0 m]
Owner:State Highway Agency [01]
Year built:1973
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: May 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:7,440 [as of 2013]
Truck traffic:12% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Superior to present desirable criteria [9]
Underclearances appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Better than present minimum criteria [7]
Scour condition:Bridge not over waterway. [N]
Sufficiency rating:92.3
Estimated cost of work:$2,432,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
May 2017FairSatisfactorySatisfactorySatisfactory744092.3
May 2015FairSatisfactorySatisfactorySatisfactory744092.3
May 2013FairSatisfactorySatisfactorySatisfactory744092.3
May 2011FairSatisfactorySatisfactorySatisfactory728190.3
May 2009FairSatisfactoryGoodSatisfactory794990.2
May 2007FairSatisfactoryGoodSatisfactory771090.2
July 2005FairSatisfactoryGoodSatisfactory729290.3
May 2003FairGoodGoodSatisfactory690090.3
April 2001FairGoodGoodSatisfactory690090.3
April 1999FairGoodSatisfactorySatisfactory1397691.6
April 1997FairGoodSatisfactorySatisfactory1332387.6
April 1995GoodGoodGoodGood1241588.0
March 1993GoodGoodGoodGood800090.3

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Steel Girder/Beamlinear ft.1,0671,0370300
Steel Protective Coatingsq. ft.18,137018,13700
Deck
Reinforced Concrete Decksq. ft.9,23909,1843025
Substructure
Reinforced Concrete Columneach66000
Reinforced Concrete Abutmentlinear ft.1851611644
Reinforced Concrete Pier Caplinear ft.9191000
Joints
Pourable Jointlinear ft.176016970
Bearings
Movable Bearingeach31017140
Steel Protective Coatingsq. ft.7800780
Fixed Bearingeach170980
Steel Protective Coatingsq. ft.4300430
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.4243606310