Facts

Name:WASHINGTONFERRY RD over WEST END DITCH
Structure number:011241
Location:0.6 M.E.US.31
Purpose:Carries highway over waterway
Route classification:Local (Urban) [19]
Length of largest span:24.0 ft. [7.3 m]
Total length:47.9 ft. [14.6 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:24.9 ft. [7.6 m]
Owner:County Highway Agency [02]
Year built:1974
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Channel beam [22]
Deck type:Concrete Precast Panels [2]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: January 2016

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:175 [as of 1990]
Truck traffic:25% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:56.9 tons [51.7 metric tons]
Inventory rating:34.1 tons [31.0 metric tons]
Sufficiency rating:91.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$402,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
January 201691.0GoodGoodGoodGood-175
January 201491.0GoodGoodGoodGood-175
January 201291.0GoodGoodGoodGood-175
January 201091.0GoodGoodGoodGood-175
October 200891.0GoodGoodGoodGood-175
January 200788.8GoodGoodGoodGood-175
December 200490.5FairSatisfactorySatisfactorySatisfactory-175
December 200290.5FairSatisfactorySatisfactorySatisfactory-175
November 200090.5FairSatisfactorySatisfactorySatisfactory-175
February 199987.6FairSatisfactorySatisfactorySatisfactory-175
November 199687.4FairSatisfactorySatisfactorySatisfactory-175
December 199373.5GoodGoodGoodGood-175
March 199170.5GoodGoodGoodGood-175