+34.79295, -86.58907
34°47'35" N, 86°35'21" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.


Structure number:012057
Old structure number:0000020845M0060 (from 1992 edition)
Location:2804 WINCHESTER RD
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:11.2 ft. [3.4 m]
Total length:34.1 ft. [10.4 m]
Roadway width between curbs:54.1 ft. [16.5 m]
Deck width edge-to-edge:68.2 ft. [20.8 m]
Skew angle:30°
Owner:City or Municipal Highway Agency [04]
Year built:1978
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: August 2016 

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:14,000 [as of 2015]
Truck traffic:1% of total traffic
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:62.5 tons [56.8 metric tons]
Inventory rating:37.4 tons [34.0 metric tons]
Sufficiency rating:76.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$805,000

Previous Inspections 

DateSuff. RatingConditionCulvert ConditionSD/FOADT
August 201676.3Good7 out of 10FO14000
August 201476.3Good7 out of 10FO14000
August 201276.4Good7 out of 10FO13100
August 201076.7Good7 out of 10FO11200
August 200854.2Good7 out of 10FO13300
October 200654.2Good7 out of 10FO13300
October 200454.9Good7 out of 10FO9200
November 200254.8Good7 out of 10FO9500
January 200156.3Good7 out of 10-12925
November 199856.5Good7 out of 10-12920
November 199656.3Good7 out of 10-12900
December 199457.8Good7 out of 10-12800
January 199357.8Good7 out of 10-12700
February 199165.1Good7 out of 10-12600