+34.67427, -86.57991
34°40'27" N, 86°34'48" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.


Structure number:013955
Old structure number:0000004545M0030 (from 1992 edition)
Location:.5 MI W HWY 231 SOUTH
Purpose:Carries highway over waterway
Route classification:Local (Urban) [19]
Length of largest span:8.9 ft. [2.7 m]
Total length:26.9 ft. [8.2 m]
Roadway width between curbs:24.9 ft. [7.6 m]
Deck width edge-to-edge:24.9 ft. [7.6 m]
Skew angle:19°
Owner:City or Municipal Highway Agency [04]
Year built:1986
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Not applicable [N]
Wearing surface:Bituminous [6]

Latest Available Inspection: March 2016 

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:3,065 [as of 2013]
Truck traffic:30% of total traffic
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:97.8 tons [88.9 metric tons]
Inventory rating:63.5 tons [57.7 metric tons]
Sufficiency rating:79.9
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$377,000

Previous Inspections 

DateSuff. RatingConditionCulvert ConditionSD/FOADT
March 201679.9Good7 out of 10FO3065
March 201476.9Good7 out of 10FO3065
March 201266.9Good7 out of 10FO3065
March 201066.9Good7 out of 10FO3065
March 200866.9Good7 out of 10FO3065
September 200666.9Good7 out of 10FO3065
October 200466.9Good7 out of 10FO3065
November 200266.9Good7 out of 10FO3065
January 200166.9Good7 out of 10FO3065
December 199866.4Good7 out of 10FO3055
December 199666.1Good7 out of 10FO3050
December 199466.2Good7 out of 10-3000
February 199364.1Good7 out of 10-2900
January 199176.6Good7 out of 10-2800