SH 25/Cleburne Co. over CADRON CR.
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | SH 25/Cleburne Co. over CADRON CR. |
Structure number: | 000000000000865 |
Location: | 0.15 W JCT SH25-107 |
Purpose: | Carries highway over waterway |
Route classification: | Major Collector (Rural) [07] |
Length of largest span: | 29.9 ft. [9.1 m] |
Total length: | 89.9 ft. [27.4 m] |
Roadway width between curbs: | 24.0 ft. [7.3 m] |
Deck width edge-to-edge: | 25.9 ft. [7.9 m] |
Owner: | State Highway Agency [01] |
Year built: | 1929 |
Year reconstructed: | 1960 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | M 13.5 / H 15 [2] |
Number of main spans: | 3 |
Main spans material: | Concrete [1] |
Main spans design: | Tee beam [04] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: January 2018
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 5,300 [as of 2014] |
Truck traffic: | 21% of total traffic |
Deck condition: | Good [7 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Good [7 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Equal to present minimum criteria [6] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Pier/abutment protection: | Navigation protection not required [1] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 40.8 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $434,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
January 2018 | Fair | Good | Fair | Good | 5300 | 40.8 |
January 2016 | Fair | Good | Fair | Good | 6100 | 40.8 |
January 2014 | Fair | Good | Fair | Good | 6100 | 40.8 |
January 2012 | Fair | Good | Satisfactory | Good | 5500 | 43.0 |
January 2010 | Fair | Good | Satisfactory | Good | 5500 | 43.0 |
January 2008 | Fair | Good | Satisfactory | Good | 4400 | 43.7 |
January 2006 | Fair | Good | Satisfactory | Good | 4400 | 43.7 |
January 2004 | Fair | Good | Satisfactory | Good | 4400 | 43.7 |
February 2002 | Fair | Good | Satisfactory | Good | 4300 | 43.8 |
January 2000 | Fair | Good | Satisfactory | Good | 4300 | 43.8 |
February 1998 | Fair | Good | Satisfactory | Good | 3375 | 46.8 |
February 1997 | Fair | Good | Satisfactory | Good | 3375 | 46.8 |
February 1995 | Fair | Good | Satisfactory | Good | 1650 | 54.8 |
February 1993 | Fair | Good | Satisfactory | Good | 1650 | 54.8 |
February 1992 | Fair | Good | Satisfactory | Good | 1956 | 53.9 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Steel Girder/Beam | linear ft. | 360 | 346 | 10 | 2 | 2 |
Reinforced Concrete Girder/Beam | linear ft. | 180 | 177 | 3 | 0 | 0 |
Deck |
Reinforced Concrete Top Flange | sq. ft. | 2,340 | 2,337 | 3 | 0 | 0 |
Substructure |
Reinforced Concrete Column | each | 4 | 4 | 0 | 0 | 0 |
Reinforced Concrete Abutment | linear ft. | 116 | 101 | 15 | 0 | 0 |
Reinforced Concrete Pier Cap | linear ft. | 52 | 52 | 0 | 0 | 0 |
Bearings |
Movable Bearing | each | 6 | 6 | 0 | 0 | 0 |
Fixed Bearing | each | 8 | 8 | 0 | 0 | 0 |
Bridge Rail |
Steel or Aluminum Bridge Rail | linear ft. | 180 | 180 | 0 | 0 | 0 |