Marshall N.Center over BRUSH CREEK
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | Marshall N.Center over BRUSH CREEK |
Structure number: | 000000000019455 |
Location: | .5 Miles North US 65 |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 20.0 ft. [6.1 m] |
Total length: | 42.0 ft. [12.8 m] |
Roadway width between curbs: | 16.1 ft. [4.9 m] |
Deck width edge-to-edge: | 17.4 ft. [5.3 m] |
Skew angle: | 30° |
Owner: | City or Municipal Highway Agency [04] |
Year built: | 1930 |
Year reconstructed: | 1978 |
Historic significance: | Historical significance is not determinable at this time [4] |
Number of main spans: | 2 |
Main spans material: | Aluminum, Wrought Iron or Cast Iron [9] |
Main spans design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Cast-in-Place [1] |
Latest Available Inspection: October 2018
Good/Fair/Poor Condition: | Fair |
Status: | Posted for load [P] |
Average daily traffic: | 92 [as of 1987] |
Truck traffic: | 1% of total traffic |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Satisfactory [6 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Basically intolerable requiring high priority of replacement [2] |
Deck geometry appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Pier/abutment protection: | Navigation protection not required [1] |
Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
Sufficiency rating: | 29.5 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $231,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
October 2018 | Fair | Satisfactory | Satisfactory | Satisfactory | 92 | 29.5 |
October 2017 | Fair | Satisfactory | Satisfactory | Satisfactory | 92 | 29.5 |
October 2016 | Fair | Satisfactory | Satisfactory | Satisfactory | 92 | 29.5 |
October 2015 | Fair | Satisfactory | Satisfactory | Good | 92 | 29.5 |
October 2014 | Fair | Satisfactory | Satisfactory | Good | 92 | 29.5 |
October 2013 | Fair | Satisfactory | Satisfactory | Good | 92 | 29.5 |
November 2012 | Fair | Satisfactory | Satisfactory | Good | 92 | 29.5 |
November 2011 | Fair | Satisfactory | Satisfactory | Good | 92 | 29.5 |
December 2010 | Fair | Satisfactory | Satisfactory | Good | 92 | 29.5 |
June 2009 | Fair | Satisfactory | Satisfactory | Good | 92 | 29.5 |
July 2008 | Fair | Satisfactory | Satisfactory | Good | 92 | 29.5 |
July 2007 | Fair | Satisfactory | Satisfactory | Good | 92 | 29.5 |
July 2006 | Fair | Satisfactory | Satisfactory | Good | 92 | 29.5 |
July 2005 | Fair | Satisfactory | Satisfactory | Good | 92 | 29.5 |
July 2004 | Fair | Satisfactory | Satisfactory | Good | 92 | 29.5 |
July 2003 | Fair | Satisfactory | Satisfactory | Good | 92 | 29.5 |
July 2002 | Fair | Satisfactory | Satisfactory | Good | 92 | 32.0 |
July 2001 | Fair | Satisfactory | Satisfactory | Good | 92 | 32.0 |
July 2000 | Fair | Satisfactory | Satisfactory | Good | 92 | 32.0 |
July 1999 | Fair | Satisfactory | Good | Good | 92 | 32.0 |
July 1998 | Fair | Satisfactory | Good | Good | 92 | 32.0 |
July 1997 | Fair | Satisfactory | Good | Good | 92 | 32.0 |
June 1996 | Fair | Satisfactory | Good | Good | 92 | 32.0 |
June 1995 | Fair | Satisfactory | Good | Good | 92 | 31.7 |
June 1994 | Fair | Satisfactory | Good | Good | 92 | 31.7 |
June 1993 | Fair | Satisfactory | Good | Good | 92 | 31.7 |
May 1992 | Fair | Satisfactory | Good | Good | 92 | 31.7 |
May 1991 | Fair | Satisfactory | Good | Good | 92 | 31.7 |