IRR US 70; over Gila River @ Bylas
This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.
Map
Coordinates:
+33.18333, -110.1500033°10'60" N, 110°09'00" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | IRR US 70; over Gila River @ Bylas |
Structure number: | 00498 |
Location: | 21.5 mi E Jct SR 170 |
Purpose: | Carries highway over waterway |
Route classification: | Minor Arterial (Rural) [06] |
Length of largest span: | 79.7 ft. [24.3 m] |
Total length: | 1828.8 ft. [557.4 m] |
Roadway width between curbs: | 30.2 ft. [9.2 m] |
Deck width edge-to-edge: | 35.1 ft. [10.7 m] |
Skew angle: | 45° |
Owner: | State Highway Agency [01] |
Year built: | 1957 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | MS 18 / HS 20 [5] |
Number of main spans: | 23 |
Main spans material: | Steel continuous [4] |
Main spans design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
Latest Available Inspection: July 2009
Good/Fair/Poor Condition: | Poor |
Status: | Open, no restriction [A] |
Average daily traffic: | 3,200 [as of 2008] |
Truck traffic: | 9% of total traffic |
Deck condition: | Fair [5 out of 9] |
Superstructure condition: | Serious [3 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Deck geometry appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4] |
Scour condition: | Bridge is scour critical; bridge foundations determined to be unstable. [3] |
Sufficiency rating: | 22.2 |
Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
Estimated cost of work: | $5,854,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
July 2009 | Poor | Fair | Serious | Satisfactory | 3200 | 22.2 |
October 1999 | Fair | Satisfactory | Satisfactory | Satisfactory | 2233 | 69.3 |
November 1991 | Fair | Good | Satisfactory | Good | 3000 | 63.0 |