North 8th Ave-Saff over Gila River

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+32.84833, -109.71500
32°50'54" N, 109°42'54" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:North 8th Ave-Saff over Gila River
Structure number:09333
Location:0.85 mi N of Hwy 70
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:69.9 ft. [21.3 m]
Total length:1132.9 ft. [345.3 m]
Roadway width between curbs:22.0 ft. [6.7 m]
Deck width edge-to-edge:24.6 ft. [7.5 m]
Owner:County Highway Agency [02]
Year built:1940
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:16
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: October 2009

Good/Fair/Poor Condition:Poor
Status:Open, no restriction [A]
Average daily traffic:4,255 [as of 2008]
Truck traffic:12% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Sufficiency rating:31.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,997,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
October 2009PoorPoorFairSatisfactory425531.5
September 1999FairSatisfactoryGoodSatisfactory340047.7
March 1991FairSatisfactoryGoodSatisfactory350049.5