STATE ROUTE 70 over YUBA RIVER, UP RR SPUR

Map

Coordinates:
+39.13250, -121.58833
39°07'57" N, 121°35'18" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:STATE ROUTE 70 over YUBA RIVER, UP RR SPUR
Structure number:16 0034
Location:03-YUB-070-13.60
Purpose:Carries highway over railroad and waterway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:87.9 ft. [26.8 m]
Total length:2412.2 ft. [735.2 m]
Roadway width between curbs:59.7 ft. [18.2 m]
Deck width edge-to-edge:73.8 ft. [22.5 m]
Vertical clearance below bridge:13.1 ft. [4.0 m]
Skew angle:99°
Owner:State Highway Agency [01]
Year built:1960
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:27
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

Latest Available Inspection: February 2016

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:37,500 [as of 2009]
Truck traffic:12% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Structural appraisal:Equal to present desirable criteria [8]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:80.5 tons [73.2 metric tons]
Inventory rating:48.5 tons [44.1 metric tons]
Sufficiency rating:74.9
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$27,857,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
February 201674.9GoodVery GoodVery GoodVery GoodFO37500
February 201474.9FairGoodSatisfactorySatisfactoryFO37500
February 201274.9FairSatisfactorySatisfactorySatisfactoryFO37500
April 201075.4FairSatisfactorySatisfactorySatisfactoryFO36000
May 200875.4FairSatisfactorySatisfactorySatisfactoryFO36000
April 200675.4FairSatisfactorySatisfactorySatisfactoryFO36000
February 200483.7FairGoodGoodSatisfactoryFO13600
March 200283.7FairGoodGoodSatisfactoryFO13600
October 199783.7GoodGoodGoodGoodFO13600
June 199472.0FairGoodSatisfactorySatisfactoryFO44100
June 199272.0FairGoodSatisfactorySatisfactoryFO43600