Share:

OLIVE DRIVE over CALLOWAY CANAL

Map

Coordinates:
+35.41316, -119.11219
35°24'47" N, 119°06'44" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:OLIVE DRIVE over CALLOWAY CANAL
Structure number:50C0334
Location:W OF CALLOWAY DRIVE
Purpose:Carries highway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:13.1 ft. [4.0 m]
Total length:37.1 ft. [11.3 m]
Skew angle:45°
Owner:City or Municipal Highway Agency [04]
Year built:2003
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Concrete continuous [2]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: December 2014

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:5,000 [as of 2003]
Truck traffic:5% of total traffic
Structural appraisal:Equal to present desirable criteria [8]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Culvert condition:No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:81.4

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
December 2014Good8 out of 10500081.4
December 2010Good8 out of 10500096.5
February 2007Good8 out of 10500096.5
January 2005Good8 out of 10500081.4

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Culvert
Reinforced Concrete Culvertlinear ft.128128000