RAMP/CONNECTOR 170 over HOLLYWOOD CHANNEL

Map

Coordinates:
+34.17137, -118.38654
34°10'17" N, 118°23'12" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:RAMP/CONNECTOR 170 over HOLLYWOOD CHANNEL
Structure number:53 2333S
Location:07-LA-170-R15.80-LA
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:9.8 ft. [3.0 m]
Total length:30.8 ft. [9.4 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:27.9 ft. [8.5 m]
Skew angle:45°
Owner:State Highway Agency [01]
Year built:1966
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: March 2018

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:8,200 [as of 1998]
Truck traffic:6% of total traffic
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:80.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,475,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
March 2018Good7 out of 10820080.0
April 2014Good8 out of 10820080.0
September 2010Good8 out of 10820080.0
May 2006Good8 out of 10820080.0
January 2004Good8 out of 10820080.0
November 2001Good8 out of 10820080.0
December 1997Good8 out of 10820080.0
January 1996Good8 out of 10820099.4
December 1993Good8 out of 10780099.4
May 1992Good8 out of 10780099.4