Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:RIVERSIDE DR over LA RIV, AVE 19, UP RR
Structure number:53C0160
Location:100' W/O SAN FERNANDO RD
Purpose:Carries highway and pedestrian walkway over highway, waterway, and railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:236.9 ft. [72.2 m]
Total length:451.1 ft. [137.5 m]
Roadway width between curbs:44.0 ft. [13.4 m]
Deck width edge-to-edge:57.1 ft. [17.4 m]
Vertical clearance below bridge:16.1 ft. [4.9 m]
Skew angle:36°
Owner:City or Municipal Highway Agency [04]
Year built:1939
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Truss - Deck [09]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: May 2015

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:23,000 [as of 2005]
Truck traffic:2% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Equal to present minimum criteria [6]
Underclearances appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Basically intolerable requiring high priority of corrrective action [3]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:76.4
Recommended work:Replacement of bridge or other structure because of relocation of road. [32]
Estimated cost of work:$4,025,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
May 2015GoodVery GoodGoodGood2300076.4
May 2013PoorPoorFairSatisfactory2300060.5
May 2011PoorPoorSatisfactorySatisfactory2300073.0
March 2009PoorPoorSatisfactorySatisfactory1700075.1
August 2006PoorPoorSatisfactoryFair1700063.0
June 2004FairFairFairSatisfactory1700054.1
October 2003FairFairFairSatisfactory1220056.4
November 2001FairSatisfactoryGoodGood1220068.4
February 1999GoodGoodGoodGood1220075.9
February 1998FairGoodSatisfactoryGood1220075.9
August 1994GoodVery GoodGoodGood1220075.3
July 1990GoodVery GoodGoodGood1220075.3