EAST CHANNEL RD over SANTA MONICA CYN CHANNEL

Map

Coordinates:
+34.03899, -118.51042
34°02'20" N, 118°30'38" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:EAST CHANNEL RD over SANTA MONICA CYN CHANNEL
Structure number:53C1157
Location:0.1 MI NORTH ESPARTA WAY
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:25.6 ft. [7.8 m]
Total length:27.9 ft. [8.5 m]
Roadway width between curbs:13.5 ft. [4.1 m]
Deck width edge-to-edge:13.5 ft. [4.1 m]
Skew angle:45°
Owner:City or Municipal Highway Agency [04]
Year built:1962
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Concrete [1]
Main span design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: October 2017

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:125 [as of 2005]
Truck traffic:1% of total traffic
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:62.8
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$95,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
October 2017Good7 out of 1012562.8
September 2015Good8 out of 1012562.8
September 2013Good8 out of 1012562.8
August 2011Good8 out of 1012570.5
December 2009Good8 out of 1010073.8
September 2007Good8 out of 1010073.8
June 2004Good8 out of 1010073.8
May 2001Good8 out of 1010073.8
May 1999Good8 out of 1010073.8
January 1997Good8 out of 1010073.8
November 1995GoodN out of 1010073.8
September 1993-N out of 1010074.1
September 1991-N out of 1010074.1