Share:

HIGHLAND VALLEY RD over SYCAMORE CREEK

Map

Coordinates:
+33.05153, -117.04453
33°03'06" N, 117°02'40" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:HIGHLAND VALLEY RD over SYCAMORE CREEK
Structure number:57C0583
Location:1.8 MI E RTE 1-15
Purpose:Carries highway over waterway
Route classification:Local (Urban) [19]
Length of largest span:4.9 ft. [1.5 m]
Total length:32.2 ft. [9.8 m]
Roadway width between curbs:21.0 ft. [6.4 m]
Deck width edge-to-edge:41.0 ft. [12.5 m]
Owner:City or Municipal Highway Agency [04]
Year built:1983
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:7
Main spans material:Steel [3]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: October 2017

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:4,500 [as of 2012]
Truck traffic:1% of total traffic
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:75.6
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$174,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
October 2017Good7 out of 10450075.6
October 2015Good8 out of 10450075.6
March 2013Good7 out of 10450075.6
October 2008Good7 out of 10400075.8
April 2006--400078.8
December 2003--400075.8
July 2001--400075.8
April 1999Fair5 out of 10400064.5
February 1996Good8 out of 10400095.1
October 1993Good8 out of 10400095.1
October 1991Good8 out of 10400095.1