Share:

COLORADO AVENUE over MONUMENT CREEK

Map

Coordinates:
+38.83261, -104.83266
38°49'57" N, 104°49'58" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:COLORADO AVENUE over MONUMENT CREEK
Structure number:CSG-F.99-08.57A
Location:JUST E OF I-25
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:111.9 ft. [34.1 m]
Total length:330.7 ft. [100.8 m]
Roadway width between curbs:65.6 ft. [20.0 m]
Deck width edge-to-edge:95.5 ft. [29.1 m]
Skew angle:39°
Owner:City or Municipal Highway Agency [04]
Year built:1998
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Prestressed concrete continuous [6]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Epoxy Overlay [5]

Latest Available Inspection: April 2016

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:16,450 [as of 2013]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Better than present minimum criteria [7]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:96.2

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
April 2016FairSatisfactoryGoodGood1645096.2
April 2014FairSatisfactoryGoodGood1645096.2
April 2012FairSatisfactoryGoodGood1526696.3
April 2010FairSatisfactoryGoodGood1526696.3
March 2008FairSatisfactoryGoodGood1757696.1
May 2006FairSatisfactoryGoodGood1757696.1
May 2004FairSatisfactoryGoodGood1757696.1
May 2002FairSatisfactoryGoodGood1658296.6
June 2000GoodGoodGoodGood1658295.6
October 1999GoodGoodExcellentExcellent1658295.6
October 1998GoodGoodExcellentExcellent1658295.6

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Prestressed Concrete Closed Web/Box Girderlinear ft.662662000
Prestressed Concrete Girder/Beamlinear ft.4,9624,958220
Deck
Reinforced Concrete Decksq. ft.31,59128,4333,15800
Wearing Surfacessq. ft.31,59130,96163000
Substructure
Reinforced Concrete Columneach1010000
Reinforced Concrete Abutmentlinear ft.246239700
Reinforced Concrete Pier Caplinear ft.2462311500
Joints
Strip Seal Jointlinear ft.246024600
Pourable Jointlinear ft.24614610000
Bearings
Elastomeric Bearingeach3434000
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.662066200
Steel Protective Coatingsq. ft.662000662