Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:CIRCLE DR EB over FOUNTAIN CREEK
Structure number:CSG-I.61-06.13E
Location:0.5 MI NE OF I-25
Purpose:Carries highway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:62.3 ft. [19.0 m]
Total length:355.7 ft. [108.4 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:34.1 ft. [10.4 m]
Owner:City or Municipal Highway Agency [04]
Year built:1963
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:6
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: May 2016

Good/Fair/Poor Condition:Poor
Status:Open, no restriction [A]
Average daily traffic:15,262 [as of 2013]
Truck traffic:3% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Sufficiency rating:48.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$8,140,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
May 2016PoorPoorFairPoor1526248.2
May 2014PoorPoorFairPoor1526248.2
May 2012PoorPoorFairFair1675761.9
May 2010PoorPoorFairPoor1675747.8
March 2008FairFairFairFair1860063.8

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Steel Girder/Beamlinear ft.1,41201,2691430
Steel Protective Coatingsq. ft.1,4121,412000
Deck
Reinforced Concrete Decksq. ft.12,0972,7824,8394,4760
Wearing Surfacessq. ft.12,09711,49260500
Substructure
Reinforced Concrete Columneach100046
Reinforced Concrete Abutmentlinear ft.68432500
Reinforced Concrete Pier Caplinear ft.17012552515
Joints
Pourable Jointlinear ft.102782400
Compression Jointlinear ft.6868000
Other Jointlinear ft.68521600
Bearings
Movable Bearingeach2402400
Steel Protective Coatingsq. ft.2424000
Fixed Bearingeach2402400
Steel Protective Coatingsq. ft.2424000
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.71206523030
Steel Protective Coatingsq. ft.7127021000
Reinforced Concrete Bridge Raillinear ft.11000