Share:

CONSTITUTION AVE over WEST FORK SAND CREEK

Map

Coordinates:
+38.86082, -104.75362
38°51'39" N, 104°45'13" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:CONSTITUTION AVE over WEST FORK SAND CREEK
Structure number:CSG-K.16-10.53
Location:0.2 MI E OF ACADEMY BLVD.
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:7.9 ft. [2.4 m]
Total length:34.1 ft. [10.4 m]
Roadway width between curbs:56.4 ft. [17.2 m]
Deck width edge-to-edge:79.7 ft. [24.3 m]
Owner:City or Municipal Highway Agency [04]
Year built:1976
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: April 2016

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:13,175 [as of 2013]
Truck traffic:6% of total traffic
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Culvert condition:Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:76.4
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$276,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
April 2016Fair6 out of 101317576.4
April 2014Fair6 out of 101317576.4
April 2012Fair6 out of 101585076.1
April 2010Fair6 out of 101585076.1
March 2008Fair6 out of 101294976.4
April 2006Fair6 out of 101294993.8
May 2004Fair6 out of 101294993.8
April 2002Fair6 out of 101174794.4
June 2000Fair6 out of 101174795.3
October 1999Fair6 out of 101174793.3
October 1998Fair6 out of 101174793.3
November 1996Fair6 out of 10965393.6
July 1994Fair6 out of 10965380.2
October 1992Fair6 out of 10965380.2
July 1990Fair6 out of 101520494.7

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Culvert
Reinforced Concrete Culvertlinear ft.319031900
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.136136000
Steel Protective Coatingsq. ft.136136000