SH 2 ML SBND over I 70 ML


+39.77994, -104.94048
39°46'48" N, 104°56'26" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.


Name:SH 2 ML SBND over I 70 ML
Structure number:E-17-HU
Location:IN DENVER
Purpose:Carries highway overpass over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:65.3 ft. [19.9 m]
Total length:210.0 ft. [64.0 m]
Roadway width between curbs:46.9 ft. [14.3 m]
Deck width edge-to-edge:54.1 ft. [16.5 m]
Vertical clearance below bridge:18.0 ft. [5.5 m]
Owner:State Highway Agency [01]
Year built:1963
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Concrete continuous [2]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: October 2015 

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:26,500 [as of 2011]
Truck traffic:4% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Underclearances appraisal:Meets minimum tolerable limits to be left in place as is [4]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:51.9 tons [47.2 metric tons]
Inventory rating:30.9 tons [28.1 metric tons]
Sufficiency rating:70.3
Estimated cost of work:$1,228,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
October 201570.3FairFairSatisfactorySatisfactoryFO26500
October 201370.3FairFairSatisfactorySatisfactoryFO26500
November 201170.6FairFairSatisfactorySatisfactoryFO23350
December 200959.2FairFairSatisfactoryFairFO23350
January 200857.3FairFairSatisfactoryFairFO46700
November 200571.2FairFairSatisfactorySatisfactoryFO13092
February 200471.1FairFairSatisfactorySatisfactoryFO14948
December 200169.9FairFairSatisfactorySatisfactoryFO14948
November 199970.0FairFairGoodSatisfactoryFO14000
November 199770.1FairFairGoodSatisfactoryFO13200
November 199568.5FairFairGoodSatisfactoryFO13200
December 199371.0FairFairGoodSatisfactoryFO11500
December 199172.1FairSatisfactoryGoodSatisfactoryFO11200