7th Street over Roaring Fork River


+39.54684, -107.33053
39°32'49" N, 107°19'50" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.


Name:7th Street over Roaring Fork River
Structure number:GLNWD-7A
Location:4 Bl. W. of Pine Street
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:98.1 ft. [29.9 m]
Total length:198.5 ft. [60.5 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:44.6 ft. [13.6 m]
Owner:City or Municipal Highway Agency [04]
Year built:1991
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: November 2015 

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:8,536 [as of 2012]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:72.2 tons [65.6 metric tons]
Inventory rating:43.3 tons [39.4 metric tons]
Sufficiency rating:76.4
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$1,123,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
November 201576.4GoodGoodGoodGoodFO8536
November 201376.4GoodGoodGoodGoodFO8536
October 201176.4GoodGoodGoodGoodFO8536
October 200976.4GoodGoodGoodGoodFO8536
October 200776.4GoodGoodGoodGoodFO8536
August 200576.3GoodGoodGoodGoodFO5599
October 200396.6GoodGoodGoodGood-5939
June 200196.6GoodGoodGoodGood-5939
September 199994.6GoodGoodGoodGood-5939
August 199794.6GoodGoodGoodGood-5939
September 199597.6GoodGoodGoodGood-1995
August 199399.6GoodGoodVery GoodVery Good-1995
September 199199.6GoodVery GoodGoodGood-1995