Share:

I25 NB OFF_ON RAMP over CHEYENNE CREEK

Map

Coordinates:
+38.81550, -104.82269
38°48'56" N, 104°49'22" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:I25 NB OFF_ON RAMP over CHEYENNE CREEK
Structure number:I-17-MH
Location:IN COLORADO SPRINGS
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:39.0 ft. [11.9 m]
Total length:43.3 ft. [13.2 m]
Roadway width between curbs:39.4 ft. [12.0 m]
Deck width edge-to-edge:55.8 ft. [17.0 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:2003
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Main span material:Prestressed concrete [5]
Main span design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Epoxy Overlay [5]

Latest Available Inspection: September 2016

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:39,500 [as of 2011]
Truck traffic:9% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:77.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,178,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
September 2016GoodGoodGoodGood3950077.0
September 2014GoodGoodVery GoodVery Good3950077.0
September 2012GoodGoodVery GoodVery Good4235077.0
September 2010GoodVery GoodVery GoodVery Good4235081.0
August 2008GoodVery GoodVery GoodVery Good4235081.0
August 2006GoodVery GoodVery GoodVery Good882079.0
July 2004GoodVery GoodVery GoodVery Good7137679.0
January 2003GoodVery GoodVery GoodVery Good-89.0

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Prestressed Concrete Closed Web/Box Girderlinear ft.475469600
Deck
Reinforced Concrete Decksq. ft.2,4102,410000
Substructure
Reinforced Concrete Abutmentlinear ft.112981400
Joints
Strip Seal Jointlinear ft.7876200
Pourable Jointlinear ft.7878000
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.8686000
Steel Protective Coatingsq. ft.8686000