SR-10 E.B. over SAN PABLO RIVER (IWW)

Map 

Coordinates:
+30.32333, -81.43917
30°19'24" N, 81°26'21" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:SR-10 E.B. over SAN PABLO RIVER (IWW)
Structure number:720044
Location:SR-10 EB/San Pablo River
Purpose:Carries highway over highway and waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:129.9 ft. [39.6 m]
Total length:2350.2 ft. [716.3 m]
Roadway width between curbs:55.8 ft. [17.0 m]
Deck width edge-to-edge:59.1 ft. [18.0 m]
Vertical clearance below bridge:64.0 ft. [19.5 m]
Owner:State Highway Agency [01]
Year built:1965
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

Latest Available Inspection: November 2015 

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:23,500 [as of 2014]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Superior to present desirable criteria [9]
Underclearances appraisal:Superior to present desirable criteria [9]
Water adequacy appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Pier/abutment protection:In place but in a deteriorated condition [3]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:56.1 tons [51.0 metric tons]
Inventory rating:33.7 tons [30.6 metric tons]
Sufficiency rating:90.3
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$48,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
November 201590.3FairGoodSatisfactorySatisfactory-23500
November 201390.6FairGoodSatisfactorySatisfactory-22750
November 201191.5FairGoodSatisfactorySatisfactory-22750
November 200991.2FairGoodSatisfactorySatisfactory-23500
November 200797.5FairGoodGoodSatisfactory-26250
November 200597.5FairGoodGoodSatisfactory-27250
November 200398.4FairGoodGoodSatisfactory-29750
December 200194.6FairGoodGoodSatisfactory-31000
February 200063.1FairGoodGoodSatisfactory-48500
February 199863.1FairGoodGoodSatisfactory-55000
January 199651.9FairGoodGoodFair-54000
February 199460.9FairGoodGoodSatisfactory-48444
March 199260.9FairGoodSatisfactorySatisfactory-48444
May 199060.9FairGoodSatisfactorySatisfactory-46995