I-295 SB (BUCKMAN) over ST. JOHNS RIVER

Map

Coordinates:
+30.19028, -81.66528
30°11'25" N, 81°39'55" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts

Name:I-295 SB (BUCKMAN) over ST. JOHNS RIVER
Structure number:720249
Location:I-295 OVER ST.JOHNS RIVER
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:250.0 ft. [76.2 m]
Total length:16301.0 ft. [4968.3 m]
Roadway width between curbs:67.9 ft. [20.7 m]
Deck width edge-to-edge:71.2 ft. [21.7 m]
Vertical clearance above deck:18.0 ft. [5.5 m]
Vertical clearance below bridge:65.0 ft. [19.8 m]
Owner:State Highway Agency [01]
Year built:1970
Year reconstructed:1995
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

Latest Available Inspection: April 2015

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:62,750 [as of 2014]
Truck traffic:11% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:42.5 tons [38.6 metric tons]
Inventory rating:32.8 tons [29.8 metric tons]
Sufficiency rating:90.7
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$839,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
April 201590.7FairSatisfactorySatisfactorySatisfactory-62750
April 201390.7FairSatisfactorySatisfactorySatisfactory-62500
April 201190.9FairSatisfactorySatisfactorySatisfactory-60750
April 200992.1FairSatisfactorySatisfactorySatisfactory-62500
April 200791.9FairSatisfactorySatisfactorySatisfactory-64750
April 200591.9FairSatisfactoryGoodSatisfactory-54500
May 200392.8FairSatisfactoryGoodSatisfactory-56000
June 200185.0FairSatisfactoryGoodSatisfactory-57750
May 199985.0FairSatisfactoryGoodSatisfactory-55500
May 199782.8FairSatisfactoryGoodFair-39000
May 199577.5FairSatisfactoryGoodSatisfactory-37250
August 199365.7FairSatisfactoryGoodFair-38227
October 199177.4FairSatisfactoryGoodSatisfactory-38227