Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:SR-202 (JTB) over PUNCHEON CREEK
Structure number:720288
Location:0.6 MI. E. OF US-ALT-1
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:25.9 ft. [7.9 m]
Total length:101.1 ft. [30.8 m]
Roadway width between curbs:129.9 ft. [39.6 m]
Deck width edge-to-edge:134.8 ft. [41.1 m]
Owner:State Highway Agency [01]
Year built:1972
Year reconstructed:2004
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]

Latest Available Inspection: June 2015

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:98,000 [as of 2014]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Superior to present desirable criteria [9]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:63.3 tons [57.5 metric tons]
Inventory rating:37.8 tons [34.4 metric tons]
Sufficiency rating:80.0

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
June 201580.0FairSatisfactorySatisfactorySatisfactory-98000
June 201385.0FairGoodGoodSatisfactory-96500
June 201180.0FairGoodGoodSatisfactory-82000
June 200985.0FairGoodGoodSatisfactory-83000
July 200785.0GoodGoodGoodGood-42000
July 200592.2GoodGoodGoodGood-83500
July 200398.3GoodGoodGoodGood-36250
June 200198.1GoodGoodGoodGood-40250
July 199996.3GoodGoodGoodGood-36500
August 199796.7GoodGoodGoodGood-35500
September 199598.1GoodGoodGoodGood-25500
September 199398.4GoodGoodGoodGood-21082
November 199198.2GoodGoodGoodGood-23574

Element Data

Source: National Bridge Elements dataset, 2016 edition. This feature is experimental.
ElementUnitsQuantity1. Good2. Fair3. Poor4. Serious
Substructure
Reinforced Concrete Abutmentlinear ft.2752611400
Prestressed Concrete Pileeach63107460
Reinforced Concrete Pier Caplinear ft.405402300
Joints
Pourable Jointlinear ft.2601738700
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.303303000
Deck
Reinforced Concrete Slabsq. ft.13,64911,3292,32000