Share:

SR-202 (JTB) over TIGER HOLE CREEK

Map

Coordinates:
+30.25000, -81.56361
30°15'00" N, 81°33'49" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:SR-202 (JTB) over TIGER HOLE CREEK
Structure number:720293
Location:2 MI. E. OF I-95
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:25.9 ft. [7.9 m]
Total length:101.1 ft. [30.8 m]
Roadway width between curbs:105.3 ft. [32.1 m]
Deck width edge-to-edge:110.9 ft. [33.8 m]
Owner:State Highway Agency [01]
Year built:1974
Year reconstructed:2004
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]

Latest Available Inspection: June 2015

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:88,000 [as of 2014]
Truck traffic:2% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Superior to present desirable criteria [9]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:64.2 tons [58.4 metric tons]
Inventory rating:38.5 tons [35.0 metric tons]
Sufficiency rating:85.0

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
June 201585.0FairSatisfactorySatisfactoryGood-88000
June 201385.0GoodGoodGoodGood-82000
June 201185.0GoodGoodGoodGood-81500
June 200985.0GoodGoodGoodGood-83000
June 200789.2GoodGoodGoodGood-46000
June 200585.0GoodGoodGoodVery Good-73000
May 200398.3GoodGoodGoodVery Good-37250
May 200198.3GoodGoodGoodVery Good-36000
June 199996.3GoodGoodGoodVery Good-36500
July 199796.7GoodGoodGoodVery Good-35500
September 199598.1GoodGoodGoodVery Good-24750
October 199398.4GoodGoodGoodVery Good-21735
December 199198.6GoodGoodVery GoodVery Good-18853

Element Data

Source: National Bridge Elements dataset, 2016 edition. This feature is experimental.
ElementUnitsQuantity1. Good2. Fair3. Poor4. Serious
Substructure
Reinforced Concrete Abutmentlinear ft.2222101200
Prestressed Concrete Pileeach45321300
Reinforced Concrete Pier Caplinear ft.335335000
Joints
Pourable Jointlinear ft.212212000
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.303303000
Deck
Reinforced Concrete Slabsq. ft.11,2229,3141,90800