Share:

EDISON AVENUE over MCCOY'S CREEK

Map

Coordinates:
+30.32278, -81.70083
30°19'22" N, 81°42'03" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:EDISON AVENUE over MCCOY'S CREEK
Structure number:724080
Location:0.3 MI EAST OF MCDUFF AVE
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Local (Urban) [19]
Length of largest span:11.2 ft. [3.4 m]
Total length:44.0 ft. [13.4 m]
Roadway width between curbs:30.8 ft. [9.4 m]
Deck width edge-to-edge:39.0 ft. [11.9 m]
Owner:City or Municipal Highway Agency [04]
Year built:1929
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Number of main spans:4
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: January 2017

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:5,461 [as of 2015]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Superior to present desirable criteria [9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:21.1 tons [19.2 metric tons]
Inventory rating:12.7 tons [11.5 metric tons]
Sufficiency rating:19.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$853,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
January 201719.2PoorPoorPoorSatisfactorySD5461
January 201534.7PoorPoorPoorSatisfactorySD5461
January 201334.7PoorPoorPoorSatisfactorySD5461
January 201134.7PoorPoorPoorSatisfactorySD5461
January 200934.7PoorPoorPoorSatisfactorySD5461
January 200732.6PoorPoorPoorSatisfactorySD5461
January 200532.6PoorPoorPoorSatisfactorySD5461
January 200332.6PoorPoorPoorSatisfactorySD5461
January 200133.7PoorPoorPoorSatisfactorySD5461
January 199949.5PoorPoorFairSatisfactorySD5461
January 199757.6PoorPoorSatisfactoryGoodSD5461
February 199557.8PoorPoorSatisfactoryGoodSD5461
February 199355.5FairSatisfactoryGoodGoodFO5461
July 199146.2FairFairFairSatisfactoryFO5461