Share:

MIAMI AVE SB over MIAMI RIVER (FRAC CRT)

Map

Coordinates:
+25.76972, -80.19333
25°46'11" N, 80°11'36" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts

Name:MIAMI AVE SB over MIAMI RIVER (FRAC CRT)
Structure number:874663
Location:200 FT S/O SW 3RD ST.
Purpose:Carries highway and pedestrian walkway over highway and waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:175.9 ft. [53.6 m]
Total length:629.0 ft. [191.7 m]
Roadway width between curbs:42.3 ft. [12.9 m]
Deck width edge-to-edge:51.2 ft. [15.6 m]
Vertical clearance above deck:19.7 ft. [6.0 m]
Vertical clearance below bridge:19.0 ft. [5.8 m]
Owner:County Highway Agency [02]
Year built:1985
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Steel [3]
Main span design:Movable - Bascule [16]
Deck type:Open Grating [3]

Latest Available Inspection: January 2016

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:4,460 [as of 2015]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Underclearances appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:23.9 tons [21.7 metric tons]
Inventory rating:15.8 tons [14.4 metric tons]
Sufficiency rating:46.7
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$2,181,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
January 201646.7FairSatisfactorySatisfactoryGood-4460
January 201439.8PoorPoorFairGoodSD4460
January 201239.8PoorPoorFairGoodSD4460
January 201043.0PoorPoorFairGoodSD4460
March 200872.4PoorPoorGoodGoodSD4460
January 200843.0PoorPoorFairGoodSD4460
January 200772.4PoorPoorGoodGoodSD4460
February 200451.6PoorPoorGoodGoodSD4460
June 200275.7GoodGoodGoodGood-4460
September 200075.7GoodGoodGoodGood-4460
September 199973.7GoodGoodGoodGood-4460
August 199773.5GoodGoodGoodGood-4284
October 199573.6GoodGoodGoodGood-4200
February 199474.6GoodVery GoodVery GoodVery Good-4200
August 199282.5GoodGoodVery GoodVery Good-3400
August 199182.5GoodGoodVery GoodVery Good-3400