SR 293 over SHANTY BRANCH

Map

Coordinates:
+34.23850, -84.92774
34°14'19" N, 84°55'40" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:SR 293 over SHANTY BRANCH
Structure number:000000001500670
Location:1.1 MI E OF KINGSTON
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:7.9 ft. [2.4 m]
Total length:25.9 ft. [7.9 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:29.9 ft. [9.1 m]
Owner:State Highway Agency [01]
Year built:1928
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: July 2016

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:2,530 [as of 2011]
Truck traffic:1% of total traffic
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:77.4
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$152,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
July 2016Good7 out of 10253077.4
July 2014Good7 out of 10253078.7
June 2012Good7 out of 10253078.7
June 2010Good7 out of 10263078.6
August 2008Good7 out of 10263078.6
September 2006Good7 out of 10254078.7
August 2004Good7 out of 10275070.9
August 2002Good7 out of 10310070.7
August 2000Good7 out of 10294070.8
November 1998Good7 out of 10294070.8
August 1996Good7 out of 10294070.8
August 1994Good7 out of 10294070.6
July 1992Good7 out of 10294070.6
December 1990Good7 out of 10294070.6

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Culvert
Reinforced Concrete Culvertlinear ft.9090000