Facts 

Name:CR 95 over SPANISH CREEK
Structure number:000000004950520
Location:5 MI N OF FOLKSTON
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:16.1 ft. [4.9 m]
Total length:175.9 ft. [53.6 m]
Roadway width between curbs:20.3 ft. [6.2 m]
Deck width edge-to-edge:21.3 ft. [6.5 m]
Owner:County Highway Agency [02]
Year built:1950
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:11
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: July 2015 

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:80 [as of 2012]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:29.7 tons [27.0 metric tons]
Inventory rating:17.8 tons [16.2 metric tons]
Sufficiency rating:63.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,032,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
July 201563.7FairSatisfactorySatisfactoryFair-80
July 201363.7FairSatisfactorySatisfactoryFair-80
June 201149.2FairGoodGoodFair-104
June 200949.2FairGoodGoodFair-140
June 200749.2FairGoodGoodFair-140
June 200563.8FairGoodGoodFair-70
June 200373.7GoodGoodGoodGood-100
August 200173.7GoodGoodGoodGood-100
November 199948.7GoodGoodGoodGood-170
February 199737.7FairGoodFairGoodSD170
February 199547.7FairGoodSatisfactoryGood-170
January 199347.7FairGoodSatisfactoryGood-170
January 199147.7FairGoodSatisfactoryGood-170