Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:MOULTRIE LENOX RD over LITTLE RIVER
Structure number:000000007100450
Location:9 MI E OF NORMAN PARK.
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:32.2 ft. [9.8 m]
Total length:255.9 ft. [78.0 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:32.2 ft. [9.8 m]
Owner:County Highway Agency [02]
Year built:1964
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:8
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: February 2017

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:740 [as of 2011]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Sufficiency rating:54.2
Estimated cost of work:$1,500,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
February 2017FairGoodGoodFair74054.2
February 2015FairGoodGoodFair74054.2
February 2013FairGoodGoodFair74054.2
February 2011FairGoodGoodSatisfactory69064.3
February 2009FairGoodGoodSatisfactory69064.3
February 2007FairGoodGoodSatisfactory69064.3
December 2004FairGoodGoodSatisfactory77057.5
January 2003GoodGoodGoodGood80057.5
January 2001GoodGoodGoodGood70077.2
March 1999GoodGoodGoodGood70077.1
March 1997GoodGoodGoodGood70077.1
March 1995FairSatisfactoryGoodGood63076.7
April 1993FairSatisfactoryGoodGood63076.7
May 1991FairSatisfactoryGoodGood51776.8

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Reinforced Concrete Girder/Beamlinear ft.1,0241,024000
Deck
Reinforced Concrete Top Flangesq. ft.8,2168,216000
Substructure
Reinforced Concrete Abutmentlinear ft.6666000
Steel Pileeach2870210
Steel Protective Coatingsq. ft.1,413070563870
Reinforced Concrete Pier Caplinear ft.175175000
Joints
Pourable Jointlinear ft.2881989000
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.512512000