Name:FUNSTON-SALE CTY R over BRIDGE CREEK
Structure number:000000007151760
Location:APP 9 MI NW OF MOULTRIE
Purpose:Carries highway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:29.9 ft. [9.1 m]
Total length:180.1 ft. [54.9 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:29.9 ft. [9.1 m]
Owner:County Highway Agency [02]
Year built:1958
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:6
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: March 2017

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:490 [as of 2012]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Sufficiency rating:68.7

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
March 2017FairGoodGoodSatisfactory49068.7
March 2015FairGoodGoodSatisfactory49068.7
March 2013FairGoodGoodSatisfactory49068.7
March 2011FairGoodGoodSatisfactory55067.2
March 2009FairGoodGoodSatisfactory55067.2
March 2007FairGoodGoodSatisfactory55067.2
March 2005FairGoodGoodSatisfactory316059.8
March 2003FairGoodGoodSatisfactory40069.8
April 2001FairGoodGoodSatisfactory50074.3
May 1999FairGoodGoodSatisfactory40075.4
May 1997FairGoodGoodSatisfactory40075.4
April 1995FairGoodGoodSatisfactory40075.8
May 1993GoodGoodGoodGood40075.8
May 1991GoodGoodGoodGood40075.8

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Reinforced Concrete Girder/Beamlinear ft.720720000
Deck
Reinforced Concrete Top Flangesq. ft.5,3825,382000
Substructure
Reinforced Concrete Abutmentlinear ft.4848000
Prestressed Concrete Pileeach2002000
Reinforced Concrete Pier Caplinear ft.115115000
Joints
Pourable Jointlinear ft.252126105210
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.3723521910