FRIENDSHIP BAPTIST over SUGAR CREEK

Map

Coordinates:
+32.10977, -83.11542
32°06'35" N, 83°06'56" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:FRIENDSHIP BAPTIST over SUGAR CREEK
Structure number:000000009150040
Location:3 MI W OF CHAUNCEY
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:20.0 ft. [6.1 m]
Total length:100.1 ft. [30.5 m]
Roadway width between curbs:23.3 ft. [7.1 m]
Deck width edge-to-edge:25.3 ft. [7.7 m]
Owner:County Highway Agency [02]
Year built:1960
Year reconstructed:2001
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:5
Main spans material:Prestressed concrete [5]
Main spans design:Channel beam [22]
Deck type:Concrete Precast Panels [2]

Latest Available Inspection: November 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:490 [as of 2012]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Sufficiency rating:82.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$586,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
November 2017FairGoodGoodSatisfactory49082.3
December 2015FairGoodGoodSatisfactory49082.3
December 2013FairGoodGoodSatisfactory49082.3
December 2011FairGoodGoodSatisfactory60080.8
December 2009FairGoodGoodSatisfactory62076.4
November 2007FairGoodGoodSatisfactory62076.4
November 2005FairGoodGoodSatisfactory39076.4
January 2004FairGoodGoodSatisfactory74076.4
January 2002FairGoodGoodFair74067.3
December 1999PoorSatisfactorySatisfactoryPoor47029.6
January 1998PoorSatisfactorySatisfactoryPoor45029.6
September 1995PoorSatisfactorySatisfactoryPoor43028.6
October 1993PoorSatisfactorySatisfactoryPoor40029.7
October 1991PoorSatisfactorySatisfactoryPoor32229.7

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Reinforced Concrete Girder/Beamlinear ft.800800000
Deck
Reinforced Concrete Top Flangesq. ft.2,5202,520000
Substructure
Reinforced Concrete Abutmentlinear ft.5454000
Timber Pileeach2020000
Reinforced Concrete Pier Caplinear ft.108106200
Joints
Pourable Jointlinear ft.96720024
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.200200000