Share:

TATTNALL-PERRY RD over BULL CREEK

Map

Coordinates:
+32.11906, -81.93282
32°07'09" N, 81°55'58" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:TATTNALL-PERRY RD over BULL CREEK
Structure number:000000010950060
Location:3 MI S OF CLAXTON
Purpose:Carries highway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:20.0 ft. [6.1 m]
Total length:60.0 ft. [18.3 m]
Roadway width between curbs:23.0 ft. [7.0 m]
Deck width edge-to-edge:25.3 ft. [7.7 m]
Owner:County Highway Agency [02]
Year built:1965
Year reconstructed:2005
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Channel beam [22]
Deck type:Concrete Precast Panels [2]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: February 2017

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:670 [as of 2011]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Sufficiency rating:80.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$352,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
February 2017GoodGoodGoodGood67080.8
February 2015GoodGoodGoodGood67080.8
February 2013GoodGoodGoodGood67080.8
February 2011GoodGoodGoodGood74080.7
February 2009GoodGoodGoodGood74080.7
February 2007GoodGoodGoodGood74084.8
December 2005GoodGoodGoodGood52084.9
February 2005FairGoodGoodFair140051.9
February 2003FairGoodGoodFair97054.1
February 2001FairGoodGoodFair96061.2
March 1999FairGoodGoodFair94057.1
March 1996FairGoodGoodFair82055.6
April 1994FairGoodGoodFair75060.2
May 1992FairGoodGoodFair56060.3
August 1990FairGoodGoodFair56060.3

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Reinforced Concrete Girder/Beamlinear ft.480480000
Deck
Reinforced Concrete Top Flangesq. ft.1,5121,512000
Substructure
Reinforced Concrete Abutmentlinear ft.2828000
Prestressed Concrete Pileeach66000
Reinforced Concrete Pier Caplinear ft.5656000
Joints
Pourable Jointlinear ft.922346230
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.120120000