NORTHSIDE DRIVE over PEACHTREE CREEK

Map

Coordinates:
+33.82026, -84.40754
33°49'13" N, 84°24'27" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts

Name:NORTHSIDE DRIVE over PEACHTREE CREEK
Structure number:000000012100130
Location:IN NORTH ATLANTA
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:43.0 ft. [13.1 m]
Total length:125.0 ft. [38.1 m]
Roadway width between curbs:32.5 ft. [9.9 m]
Deck width edge-to-edge:40.0 ft. [12.2 m]
Owner:State Highway Agency [01]
Year built:1926
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: April 2015

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:13,670 [as of 2012]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Basically intolerable requiring high priority of replacement [2]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank protection has failed. River control devices have been destroyed. Stream bed aggradation, degradation or lateral movement has changed the channel to now threaten the bridge and/or approach roadway. [3]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:20.8 tons [18.9 metric tons]
Sufficiency rating:41.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$932,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
April 201541.2FairFairFairFairSD13670
May 201341.2FairFairFairFairSD13670
May 201142.6FairSatisfactoryFairFairSD13250
August 200944.4FairSatisfactoryFairFairSD9540
June 200742.7FairSatisfactoryFairFairSD13010
June 200541.6FairSatisfactoryFairFairSD15400
May 200342.7FairSatisfactoryFairFairSD13200
July 200141.5FairSatisfactoryFairFairSD15550
October 199941.5FairSatisfactoryFairFairSD15550
October 199641.5FairSatisfactoryFairFairSD15550
December 199440.1FairSatisfactoryFairFairSD15550
June 199250.1FairSatisfactoryFairFairSD15550
June 199050.3FairSatisfactoryFairFairSD14970