Share:

BOLTON ROAD over I-285- PROCTOR CREEK

Map 

Coordinates:
+33.80013, -84.48815
33°48'00" N, 84°29'17" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:BOLTON ROAD over I-285- PROCTOR CREEK
Structure number:000000012100670
Location:IN W ATLANTA
Purpose:Carries highway and pedestrian walkway over highway and waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:134.8 ft. [41.1 m]
Total length:513.1 ft. [156.4 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:37.7 ft. [11.5 m]
Vertical clearance below bridge:16.1 ft. [4.9 m]
Skew angle:35°
Owner:State Highway Agency [01]
Year built:1968
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:5
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: July 2015 

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:14,140 [as of 2012]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:44.6 tons [40.5 metric tons]
Inventory rating:25.7 tons [23.4 metric tons]
Sufficiency rating:61.1
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$3,007,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
July 201561.1FairSatisfactoryGoodGoodFO14140
July 201361.1FairSatisfactoryGoodGoodFO14140
July 201165.0GoodGoodGoodGood-15160
September 200965.0GoodGoodVery GoodGood-15160
July 200765.4GoodGoodVery GoodGood-13150
August 200565.2GoodGoodVery GoodGood-14230
August 200376.9GoodGoodVery GoodGood-17900
October 200177.0GoodVery GoodVery GoodGood-17300
July 199974.5FairSatisfactoryGoodGood-19500
October 199675.5FairSatisfactoryGoodGood-19500
November 199474.8FairFairSatisfactoryGood-16790
November 199274.8FairFairSatisfactoryGood-16790
November 199075.8FairFairGoodGood-16790