Share:

POWERS FERRY RD over NANCY CREEK

Map

Coordinates:
+33.86771, -84.39288
33°52'04" N, 84°23'34" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts

Name:POWERS FERRY RD over NANCY CREEK
Structure number:000000012104480
Location:IN N ATLANTA
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:44.9 ft. [13.7 m]
Total length:105.0 ft. [32.0 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:39.7 ft. [12.1 m]
Owner:City or Municipal Highway Agency [04]
Year built:1946
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: January 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:6,460 [as of 2011]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:41.6 tons [37.8 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Sufficiency rating:66.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$615,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
January 201766.4FairSatisfactorySatisfactorySatisfactoryFO6460
February 201566.4FairSatisfactorySatisfactorySatisfactoryFO6460
February 201356.3FairSatisfactorySatisfactoryFairFO6460
February 201142.9PoorGoodGoodPoorSD6700
January 200918.2PoorGoodGoodPoorSD6700
January 200718.2PoorGoodGoodPoorSD6700
January 200518.3PoorGoodGoodPoorSD6440
February 200318.5PoorGoodGoodPoorSD6100
October 200014.8PoorGoodGoodPoorSD12600
June 199814.8FairSatisfactoryGoodFairSD12600
January 199510.5PoorSatisfactoryGoodSeriousSD12600
December 199210.5PoorSatisfactoryGoodSeriousSD12600
January 199139.2FairSatisfactoryGoodFairSD12600