Share:

RAIL FENCE ROAD over GRIFFIN CREEK

Map

Coordinates:
+33.70317, -83.05077
33°42'11" N, 83°03'03" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:RAIL FENCE ROAD over GRIFFIN CREEK
Structure number:000000013350320
Location:6 MI NE OF WOODVILLE
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:28.9 ft. [8.8 m]
Total length:28.9 ft. [8.8 m]
Roadway width between curbs:12.1 ft. [3.7 m]
Deck width edge-to-edge:12.5 ft. [3.8 m]
Skew angle:45°
Owner:County Highway Agency [02]
Year built:1960
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: May 2016

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:104 [as of 2011]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Basically intolerable requiring high priority of corrrective action [3]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Sufficiency rating:20.1
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$124,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
May 2016FairFairSatisfactoryFair10420.1
May 2014FairFairSatisfactoryFair10420.1
May 2012FairFairSatisfactoryFair10420.1
June 2010FairFairSatisfactoryFair14019.8
June 2008FairFairSatisfactoryFair14013.9
May 2006FairFairSatisfactoryFair15013.7
May 2004FairFairSatisfactorySatisfactory10026.0
April 2002FairFairSatisfactorySatisfactory10026.0
April 2000FairFairSatisfactorySatisfactory10026.0
May 1998FairFairSatisfactoryFair9015.0
May 1996FairFairFairFair9015.0
September 1994FairFairFairFair9016.7
December 1992FairFairFairFair9016.7
April 1991FairFairFairFair9016.7

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Steel Girder/Beamlinear ft.145014500
Steel Protective Coatingsq. ft.431004310
Deck
Reinforced Concrete Decksq. ft.3650321440
Substructure
Other Material Abutmentlinear ft.32221000
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.5800580