Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:JOE CHANDLER RD over CEDAR CREEK
Structure number:000000013900660
Location:5.3 MI E OF GAINESVILLE
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:9.8 ft. [3.0 m]
Total length:32.2 ft. [9.8 m]
Owner:County Highway Agency [02]
Year built:1955
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: May 2015

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:2,470 [as of 2012]
Truck traffic:1% of total traffic
Structural appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Culvert condition:Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:45.5 tons [41.4 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Sufficiency rating:92.1
Estimated cost of work:$188,000

Previous Inspections

DateSuff. RatingConditionCulvert ConditionSD/FOADT
May 201592.1Fair6 out of 10-2470
May 201381.1Fair5 out of 10-2470
May 201181.0Fair5 out of 10-3060
April 200981.0Fair5 out of 10-3060
April 200780.9Fair5 out of 10-3090
April 200580.9Fair5 out of 10-3130
April 200380.9Fair5 out of 10-3300
May 200172.3Fair5 out of 10-2900
August 199972.0Fair5 out of 10-4200
July 199772.3Fair5 out of 10-2600
April 199572.3Fair5 out of 10-2600
March 199382.4Fair6 out of 10-2320
April 199182.5Fair6 out of 10-2040

Element Data

Source: National Bridge Elements dataset, 2016 edition. This feature is experimental.
ElementUnitsQuantity1. Good2. Fair3. Poor4. Serious
Culvert
Reinforced Concrete Culvertlinear ft.120120000