Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:CR 194 over POOLES CREEK
Structure number:000000014750400
Location:3.4 MI N OF BOWERSVILLE
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:26.9 ft. [8.2 m]
Total length:26.9 ft. [8.2 m]
Roadway width between curbs:20.3 ft. [6.2 m]
Deck width edge-to-edge:20.3 ft. [6.2 m]
Owner:County Highway Agency [02]
Year built:1988
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: December 2018

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:240 [as of 2011]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Sufficiency rating:64.3
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$158,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
December 2018FairGoodGoodSatisfactory24064.3
December 2016FairSatisfactorySatisfactoryFair24054.2
December 2014FairSatisfactorySatisfactoryFair24054.2
December 2012FairSatisfactorySatisfactoryFair24054.2
December 2010FairSatisfactorySatisfactoryFair62050.5
January 2009FairSatisfactorySatisfactorySatisfactory62060.6
January 2007FairSatisfactorySatisfactorySatisfactory63063.7
January 2005FairGoodSatisfactorySatisfactory74063.6
January 2003FairGoodSatisfactorySatisfactory74063.6
January 2001FairGoodSatisfactorySatisfactory48064.8
April 1999FairGoodSatisfactorySatisfactory47063.6
January 1997FairGoodSatisfactorySatisfactory43063.6
February 1995FairGoodSatisfactorySatisfactory39066.8
January 1993FairGoodSatisfactorySatisfactory8083.0
February 1991FairGoodSatisfactoryGood8083.0

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Steel Girder/Beamlinear ft.243024300
Steel Protective Coatingsq. ft.1,373001,3730
Deck
Reinforced Concrete Decksq. ft.548548000
Substructure
Steel Columneach80800
Steel Protective Coatingsq. ft.2000200
Steel Abutmentlinear ft.4004000
Steel Protective Coatingsq. ft.4000400