BARWICK ROAD over OCHEE CREEK

Map

Coordinates:
+32.31233, -84.39378
32°18'44" N, 84°23'38" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:BARWICK ROAD over OCHEE CREEK
Structure number:000000019700210
Location:7 MI E OF BUENA VISTA
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:16.1 ft. [4.9 m]
Total length:111.9 ft. [34.1 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:25.3 ft. [7.7 m]
Owner:County Highway Agency [02]
Year built:1960
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:7
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: April 2017

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:30 [as of 2011]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Serious [3 out of 9]
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Sufficiency rating:40.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$198,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
April 2017PoorSatisfactorySatisfactorySerious3040.9
April 2015PoorSatisfactorySatisfactorySerious3040.9
April 2013PoorSatisfactorySatisfactorySerious3040.9
July 2011PoorSatisfactorySatisfactorySerious3039.9
April 2009PoorSatisfactorySatisfactorySerious4039.9
April 2007PoorSatisfactorySatisfactorySerious4039.9
April 2005PoorSatisfactorySatisfactorySerious54026.0
May 2003PoorSatisfactorySatisfactorySerious65025.4
July 2001PoorSatisfactorySatisfactorySerious100016.9
June 1999PoorSatisfactorySatisfactorySerious93017.4
May 1997PoorGoodGoodSerious67025.3
May 1995PoorGoodGoodSerious67025.6
May 1993PoorGoodGoodSerious55026.5
July 1991PoorGoodGoodSerious6040.9

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Steel Girder/Beamlinear ft.7846869800
Steel Protective Coatingsq. ft.2,807002,8070
Deck
Reinforced Concrete Decksq. ft.2,8282,38044800
Substructure
Reinforced Concrete Abutmentlinear ft.5252000
Timber Pileeach4242000
Reinforced Concrete Pier Caplinear ft.156156000
Joints
Pourable Jointlinear ft.168000168