Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:MT ZION CHURCH RD over MUCKALEE CREEK
Structure number:000000019750160
Location:6 MI SE OF BUENA VISTA
Purpose:Carries highway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:16.1 ft. [4.9 m]
Total length:80.1 ft. [24.4 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:25.3 ft. [7.7 m]
Owner:County Highway Agency [02]
Year built:1960
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:5
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: April 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:600 [as of 2011]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Meets minimum tolerable limits to be left in place as is [4]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Sufficiency rating:66.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$228,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
April 2017FairGoodSatisfactoryFair60066.3
April 2015FairGoodSatisfactoryFair60066.3
April 2013PoorGoodSatisfactoryPoor60050.2
June 2011PoorGoodSatisfactoryPoor60048.6
May 2009PoorGoodSatisfactoryPoor58048.7
April 2007PoorGoodSatisfactoryPoor58048.7
April 2005PoorGoodSatisfactoryPoor54048.7
April 2003PoorGoodGoodPoor63048.6
June 2001PoorGoodGoodPoor100044.0
June 1999PoorGoodGoodPoor93044.1
May 1997PoorGoodGoodPoor67049.0
May 1995PoorGoodGoodPoor67049.2
May 1993FairGoodGoodFair53062.8
July 1991FairGoodGoodFair47062.9

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Steel Girder/Beamlinear ft.5604907000
Steel Protective Coatingsq. ft.2,00502,00500
Deck
Reinforced Concrete Decksq. ft.2,0202,020000
Substructure
Reinforced Concrete Abutmentlinear ft.5252000
Timber Pileeach169700
Reinforced Concrete Pier Caplinear ft.104104000
Joints
Pourable Jointlinear ft.120024960